Application scenario
  • ● Cooperate with transformer to solve problems such as short-time overload, three-phase imbalance and insufficient reactive power compensation
  • ● coordinated control and realize local consumption of new energy
  • ● Configurable SCR for fast switching within 10ms
programme

area.png

Scheme features
  • ● Good real-time communication and high system dynamic reliability
  • ● Suitable for dynamic capacity expansion in remote areas, reducing investment in distribution network equipment
Recommended products

WeChat WeChat